top of page
stadsring-bg.jpg

Stadsring 157-165 breathes new life with this transfomative initiative into  converting a dated office building into a vibrant residential and commercial hub.

LOCATION 
STADSRING 157 | 165
AMERSFOORT

CONCEPT OF STADSRING

Stadsring 157-165 stands out as a model of thoughtful urban regeneration. By retaining its existing structure, the obtains a contemparory design incorporating modern, sustainable features.

The transformation includes sedum roofs, energy-efficient HR++ glazing, individual heat pumps and warm materials like bronze-colored aluminum for the façade.

Studios, 2- & 3-Bedroom Apartments, 35–73 m²
18 Units with Balconies, 
9 with Terraces

development at a glance

Sedum Roofs, HR++ Glazing, Heat Recovery System

SUSTAINABILITY

176 m² Rooftop Terrace, 55 Parking Spaces (EV-Ready),
Bicycle Storage for 105 Bikes

PREMIUM AMENITIES

DOWNLOAD BROCHURE

2023

Q1 | initiative started

Q2 |  Permit final

2024

Q4 | Start of demolition

2025

Q2 |  Start of construction

2025

Q4 | Completion

*Timelines are estimates and may shift due to external factors

Ideally located on the historic Stadsring, this project offers excellent connectivity, with the vibrant city center just a short walk away.

See on the map

SEE ON THE MAP

house_draft.png

PLAY

PAUSE

Great design doesn't have to come at a cost to the environment.

The design prioritizes light, openness, and a seamless connection between the building and its surroundings. With carefully integrated green spaces and balconies, the project fosters a sense of community while emphasizing sustainability.

Gert-Jan van Amerongen

LEAD PROJECT DEVELOPMENT

00:00 / 00:27
full-view.png

FULL VIEW

parking

bicycle parking

Private balconies

Seating areas

rooftop terrace

Green courtyard

private-balconies.jpg

FULL VIEW

parking

bicycle parking

Private balconies

Seating areas

rooftop terrace

Green courtyard

rooftop-terrace.jpg

FULL VIEW

parking

bicycle parking

Private balconies

Seating areas

rooftop terrace

Green courtyard

parking.jpg

FULL VIEW

Private balconies

rooftop terrace

parking

bicycle parking

Green courtyard

Seating areas

bycycle-parking.jpg

FULL VIEW

Private balconies

rooftop terrace

parking

bicycle parking

Green courtyard

Seating areas

green-courtyard.jpg

FULL VIEW

parking

bicycle parking

Private balconies

Seating areas

rooftop terrace

Green courtyard

seating-areas.jpg

FULL VIEW

Private balconies

parking

bicycle parking

rooftop terrace

Green courtyard

Seating areas

FAQ

General

Local Residents

Suppliers & Contractors

Interested

  • At the main entrance at [address], Gate 3. Registration is required.

  • Monday to Friday from 7:00 AM to 5:00 PM. No heavy transport allowed outside these hours.

  • [Site manager’s name], available at [phone number].

  • Please click here to direct to right parties. → other FAQ suppliers

  • We’re constructing 64 residential units, 1.100 m2 ground floor office, a bike and car parking facility, shared roof space, wash facilities.

  • Completion is scheduled for Q4 2025.

  • The construction works may cause some inconveniences, but we will do our utmost to minimize this. 

  • Via the form at the bottom of this page.

  • The project is developed by Bakkers | Hommen.

  • It’s still possible to park near your home. Only the parallel road in front of the building is temporary closed. An alternative routing is cleary signposted.

  • Via our newsletter or the BouwApp (link available).

  • In case of  disturbances or complaints regarding the construction works, you can reach the contractor Kondor Wessels Amsterdam via the following link: https://www.verbeterdebouw.nl/Stadsring

  • A broad range of different types with distinctive features will be built. The majority of the dwellings will be a two-room apartments. The remainder are studio apartments and three-room apartments.  

  • The apartments will be leased through our partner Holland2Stay. More information about Stadsring is available at https://holland2stay.com/comingsoon/stadsring

  • The vast majority of the to be built residential units will be in the affordable segment. In Q3 2025 we will announce indicative rental prices.

*To find your answers, first select who you are:  then you find the most important Questions and Answers on the right side

REQUEST A BROCHURE

Request our detailed brochure and get all the information you need — including floor plans, pricing, and specifications.

image 19

Bakkers | Hommen

Eindhoven | Rotterdam

STADSRING

STADSRING 157 - 165 

3817 BA AMERSFOORT

 NL

COPYRIGHT © STADSRING / LEGAL NOTICE

Fair housing notice / Standard Operating Procedures

bottom of page